【 信息发布时间:2005-06-06  阅读次数:】 【我要打印】 【关闭】
第 9 届 PAQS 日程安排 ( 暂时 ) Congress Program me , 9th PAQS TENTATIVE | ||||
日 期 (Date) | 时 间( Time ) | 演 讲 内 容 (Content of the speech) | 演讲人 (Speaker) | 备注 Reference |
6-27 ( 上午 ) 27th, June (a.m) | 9:00-9:30 | 开幕式 (Opening Ceremony) | ||
主要演讲 (Keynote speech) | 2 篇 (60min) | |||
9:30-10:00 | Cultural Challenges for Public/Private Partnership Procurement | Cliff Hardcastle ( Glasgow Caledonian University , Glasgow , Scotland ) | ||
10:00- 10:30 | 传承造价文化,营造美好未来 (Spreading Cost Management Culture, Creating a bright Future) | 吴佐民、舒宇 ( 中国建设工程造价管理协会 ) Wu Zuomin, James Y.Sue ( China Engineering Cost Association) | ||
10:30-10:50 | 中间休息 Tea & Coffee break | |||
10:50-11:50 | Session 1 (Quality Construction) | 4 篇 (70min) | ||
1.1 Specifications and Expectations: Construction Quality and Culture's Influences | Wilco Tijhuis ( University of Twente , the Netherlands ) | |||
1.2 论天然气输送管道的经济起输量与经济输量( Economic Throughput Analysis of Gas Pipeline ) | 杨家笠、刘萍 ( 中国石油规划总院石油工程造价管理中心 ) Yang jiali , Liu ping (China Petroleum Planning & Engineering Institute ) | |||
1.3 Safety Management towards Quality Construction | Husrul Nizam Husin, Syed Abdul Haris Syed Mustapa,Natasha Khalil ( University Technology MARA,Perak,Malaysia ) | |||
1.4 工程造价管理信息化风险与控制策略研究 (Information Risks and Control Strategies in Engineering Cost Management) | 王 磊、王美林、李 磊(同济大学、山东省工程建设标准定额站) ( Wang Lei ,Shanghai Tongji University Wang Meilin Li Lei Construction Engineering Standard & Cost Institute, Shandong Province,P.R.C) | |||
11:50-12:00 | Question and Answer | |||
中午 (noon) | 12:10-13:00 | 午餐 Lunch | ||
下午 (p.m) | 13:30-15:00 | Session 1 (Countinued) | 6 篇 (100min) | |
1. 5 How to Serve the Investor and the End-user | Michael C Hartmann | |||
1.6 施工阶段挣值管理法的应用拓展 ( Application Improvement on Earned Value Management in Execution Phase ) | 易涛 郭海峰 ( 华北电力大学 ) Yi Tao, Guo HaiFeng (North China Electric Power University) | |||
1.7 Key Factors Determining the Success of Implementing the MS ISO 9000 in Malaysian Construction Firms | Mohd Rofdzi Abdullah, Syed Abdul Haris Syed Mustapa (UiTM, Perak Branch, Seri Iskandar Campus, Perak , Malaysia ) | |||
1.8 试论全面造价管理在房地产开发中的作用 (The Role of Total Cost Management Played in Real Estate Development) | 叶醒 ( 融侨(福建)房地产有限公司 ) Ye Xing (Rong Qiao Real Estate Co., Ltd.Fujian Province,P.R.C) | |||
1.9 Changes in Quality after the Implementation of ISO9000-based Quality Management Systems – Project Supervisory Personnel Perspectives | Thomas Ng, Mohan Kumaraswamy, Ekambaram Palaneeswaran (The University of HongKong ) | |||
1.10 Can a Quantity Surveyor Add Value to the Project: Don't Say It, Show Us! | Eugene Seah (Davis Langdon & Seah Singapore Pte Ltd., Singapore ) | |||
15:00-15:10 | Question and Answer | |||
15:10-15:30 | 中间休息 Tea & Coffee break | |||
15:30-17:30 | Session 2 (Tendering and Contract Management) | 8 篇 (130min) | ||
2.1 Construction Project Tendering in China : an Exploration of Theory and Practice Relating to Article 33 of China's Tendering Law | Chen Jianguo, Tang Kewei ( Tongji University , Shanghai ) Richard Fellows (The University of Hong Kong ) | |||
2.2 隐含合同对于工程价格的影响分析 (Analysis of the Influences of Unexpressed Contract on Construction Price) | 刘 禹 ( 东北财经大学 建设管理学院 工程法律研究所 ) ( Liu Yu School of Construction Management Institute of Engineering Law Dongbei University of Financial & Economy) | |||
2.3 Resolving Construction Disputes – the Evolvement and Perceptions of Mediation in Malaysia | Haryati Mohd Isa, Kartina Alauddin, Hj. Mohd. Fisal Ishak (Universiti Teknologi Mara, Seri) | |||
2.4 浅谈工程量清单计价实施后施工企业的造价管理 ( Post-Contract Cost Management by Construction Enterprises ) | 赵立红 ( 北京住总集团 ) ( Zhao Lihong Beijing Uni-Construction Group Co.,Ltd ) | |||
2.5 Procurement and Contract Award Practices – a Review of the Singapore Construction Industry | D Singh, Goh Ngan Hong , Robert L K Tiong (Nanyang Technological University, Singapore) | |||
2.6 工程量清单计量支付中的工程量确定方法 (The Measurement Method Used in the Bill Of Quantitiese) | 袁 芳、沈 杰 ( 东南大学 土木工程学院 ) Yuan Fang , Shenjie (Nanjing College of Civil Engineering, SouthEast University,JiangSu Province, P.R.C ) | |||
2.7 A Framework for Examining the Relationship between Organizational Commitment and Job Performance in Chinese Construction Enterprises | Wu Jian, Anita Liu (The University of Hong Kong ) | |||
2.8 工程造价系统工程 — 控制工程造价理论研究 (System Engineering — a Study in Engineering Cost Control) | 范曙明 ( 中冶焦耐工程技术有限公司 ) Fan Shuming (ACRE Coking and Refractory Engineering Consulting Corporation) | |||
17:30-17:40 | Question and Answer | |||
6-28 (上午) 28th, June (a.m) | 8:30-10:00 | Session 3 (Value Management, Risk Management and Project Cost Control) | 6 篇 (120min) | |
3.1 Predicting Normative Commitment in Construction Value Management | Mei-yung Leung (City University of Hong Kong ) | |||
3.2 造价工程师与一体化项目控制 ( Role of the Cost Engineer in Integrated Project Control ) | 崔蔚菁 ( 包头钢铁设计研究总院 ) ( Cui Wei-jing Baotou Engineering and Research Corporation of Iron and Steel Industry, the Inner Mongolia Autonomous Region, P.R.C ) | |||
3.3 Cost Analysis and Cost Plan Civil Engineering – Rail and Road Infrastructure | Seah Kwee Yong | |||
3.4 全生命周期工程造价成本分析模型研究 (Whole Life Cycle Engineering Cost Analysis) | 董士波 郑立新 ( 哈尔滨工业大学管理科学与工 程 博士后流动站 ; 黑龙江省飞天建筑监理公司 ) Dong Shibo (Postdoctoral station on Management Science and Engineering, Harbin Institute of Technology, P.R.China, | |||
3.5 Seven Steps to Project Control for Consultancy Services Contract for Major Projects | Teoh Woon Sin ( Davis Langdon & Seah Singapore Pte Ltd., Singapore ) | |||
3.6 工程建设全过程造价咨询服务内涵研究( Provision of Cost Consultancy Services in the Construction Process ) | 刘世波 ( 山东宏嘉工程造价咨询事务所有限公司 ) Liushibo (Shandong Hopestar Engineering Cost Consultants Co.,Ltd. ) | |||
10:00-10:10 | Question and Answer | |||
10:10-10:30 | 中间休息 Tea &Coffee break | |||
10:30-11:30 | Session3 (Continued) | |||
3.7 价值工程在全过程造价管理中应用的难点问题研究 (The Problems and Practices in Applying Value Engineering in Cost Management) | 王恩茂 刘晓 君 ( 兰州交通大学 西安建筑科技大学 ) Wang Enmao ( Xi'an University of Architecture & Technology, | 4 篇 (70min) | ||
3.8 奥运场馆中 BOT 项目的风险管理 (Risk Management in the Olympic BOT Project) | 于晓红 ( 北京国奥投资发展有限公司 ) Yu Xiaohong ( Guoao Investment & development Co.,L ) | |||
3.9 Ethics for Quantity Surveyors : Issues and Dilemmas | Lim Yoke Mui, Fanny Foo Suan Suan, Azlan Raofuddin Hj Nuruddin, Abdul Rashid Abdul Aziz, Mohd Wira Mohd Shafiei ( Universiti Sains Malaysia ) | |||
3.10 基于全寿命周期的建设项目集成风险管理研究 (An Analysis Of The LC-based Integrated Risk Management Of Construction Projects) | 张传栋 尹贻林 ( 天津理工大学 ) ( Zhang Chuan-dong Yin Yilin School of economics and management, Tianjin University Of Technology ) | |||
11:30-11:40 | Question and Answer | |||
中午 (noon) | 12:10-13:00 | 午餐 lunch | ||
下午 (p.m) | 13:30-15:00 | Session 4 ( Quality Construction and Professional Services ) | 12 篇 (200min) | |
4.1 Transmigration of the Internationally Trained Professional for Immersion in the Canadian Construction Industry | Clint Kissoon (Canadian Institute of Quantity Surveyors) | |||
4.2 A Study on the Evaluation Method for the Quality of Cleaning in Government Office Buildings Part 1. Summary of Investigation and Consideration of Evaluation Standard | Takayoshi Sato (Sato Facilities Consultants, Inc.), Hiroshi Sugita (Hiroshima Institute of Technology , Japan ), Makoto Hiraga, Saburo Murakawa ( Hiroshima Univ. , Japan ) | |||
4.3 A Study on the Evaluation Method for the Quality of Cleaning in Government Office Buildings Part 2. Examination of Evaluation by Workers | Hiroshi Sugita (Hiroshima Institute of Technology , Japan ), Takayoshi Sato (Sato Facilities Consultants, Inc.), Makoto Hiraga,Saburo Murakawa ( Hiroshima Univ. , Japan ) | |||
4.4 The practicality of guarantee maximum price contract for foreign developers in China | Edward Tang (KPK Quantity Surveyors(H.K.) Ltd) | |||
4.5 A study on the Evaluation Method for the Quality of Cleaning by Visitors in the Government Office Buildings | Makoto Hiraga, Saburo Murakawa ( Hiroshima Univ. , Japan ), Hiroshi Sugita (Hiroshima Institute of Technology , Japan ) | |||
4.6 Subcontractor registration scheme – Current practice and future development | Thomas Ng , Aaron S.Y Chung (The University of Hong Kong ) | |||
15:10-15:10 | Question and Answer | |||
15:10-15:30 | 中间休息 Tea & Coffee break | |||
15:30-17:00 | 4.7 The Australian Quantity Surveying Profession | Peter Smith ( University of Technology , Sydney ) | ||
4.8 找准全过程造价咨询的定位和切入点 ( OPtional Positioning and Cut-in Point of Cost Consultancy Services in Construction ) | 林 华 ( 上海沪港建设咨询有限公司 ) ( linhua shanghai hugang construction consult co.,ltd ) | |||
4.9 Construction waste: a study of contributors and critical factors of waste on civil engineering works | Kharizam Binti Ismail, Shamsida Saidan Khaderi (University Teknologi Mara) | |||
4.10 建筑工程图形自动算量软件的应用探讨 (The Application of Architectural Engineering Graphic Automatic Measurement Software) | 曹仕雄 ( 北京广联达慧中软件有限公司 ) ( Cao Shixiong Beijing Grandsoft Technology Co., LTD. ) | |||
4.11 The Transition of the Qualification Institution to be Concerned with Quantity Surveying in BSIJ | Teruyuki Fujikami (Shibaura Institute of Technology, Japan ) Kenta Fukagawa ( Hiroshima international University , Japan ) | |||
17:00-17:10 | Question and Answer | |||
注 : 每篇论文宣读 15 分钟(每个休息时间之前安排 10 分钟问答时间),总共 41 篇论文; Note: The presentation time for each paper is fifteen minutes.There will be a ten minutes Question and Answer Section before each break.Totally 41 pieces of Paper. |